
Manarat Living 3 is a Sold Out project by ALDAR in Al Saadiyat island, Abu Dhabi, offering Apartments and Villas with Studio, 1 bedroom, 2 bedroom, 3 bedroom, and 5 bedroom configurations. A verified starting price was not published, and ha





Manarat Living 3 is a residential project by ALDAR in Al Saadiyat island, Abu Dhabi. The verified unit mix includes Apartments and Villas with Studio, 1 bedroom, 2 bedroom, 3 bedroom, and 5 bedroom configurations. The project is currently classified as Sold Out, while construction is recorded as Completed. The published handover timing is Q2 2028. The recorded development profile includes 1 building. Verified unit-size information was not available in the structured source data. Additional recorded details include unfurnished delivery. The amenity schedule identifies Bicycle Racks, Business Centre / Library, Fitness Centre, Gaming Room, Kids Play Zone, Podcast Studio, Rooftop Cinema, and Swimming Pool. These facilities should be presented exactly as documented for this project; unverified lifestyle claims have not been added. A verified starting price was not published. The published payment structure is 10% Booking, 55% During Construction, 35% Handover. Commercial terms can change, so current availability, unit-specific pricing, fees and the reservation process should be reconfirmed before migration to a live sales workflow. Manarat Living 3's location record places it in Al Saadiyat island, Abu Dhabi. Explicitly listed nearby destinations include Cranleigh Abu Dhabi, MAS Garden, Saadiyat Beach, Zayed International Airport, and The Collection Saadiyat. Travel times have not been estimated where the source supplied only a distance or no transport information. From a buyer or investor perspective, the relevant considerations are the Sold Out sales position, the Completed construction stage, the Q2 2028 handover timing, the available Apartments and Villas, and the payment obligations recorded above. This profile may suit households seeking larger-format homes and private-space living, but no return, appreciation or rental-yield claim is made. Prospective purchasers should verify the latest inventory, contract terms, service charges and completion information before making a decision. Manarat Living 3 is documented as 1 building. No additional architectural claims have been introduced beyond the verified project record. The documented lifestyle offer includes Bicycle Racks, Business Centre / Library, Fitness Centre, Gaming Room, Kids Play Zone, Podcast Studio, Rooftop Cinema, and Swimming Pool. Manarat Living 3 is recorded in Al Saadiyat island, Abu Dhabi. Verified nearby references include Cranleigh Abu Dhabi, MAS Garden, Saadiyat Beach, Zayed International Airport, and The Collection Saadiyat. No unverified driving times have been added. Use the recorded map coordinates and explicitly sourced destination distances for route planning. From a buyer or investor perspective, the relevant considerations are the Sold Out sales position, the Completed construction stage, the Q2 2028 handover timing, the available Apartments and Villas, and the payment obligations recorded above. This profile may suit households seeking larger-format homes and private-space living, but no return, appreciation or rental-yield claim is made. Prospective purchasers should verify the latest inventory, contract terms, service charges and completion information before making a decision.
Estimates based on standard Dubai fee schedules (DLD 4%, trustee, typical 2% agency, indicative mortgage terms). Actual fees vary by bank, developer promotions and unit — confirm before committing.